Implementation of Three DWGD Gran Canaria Masterplans Continuing – And With Major Construction Programmed for 2026
January 21st, 2026
David Williams Golf Design is currently overseeing the implementation of their masterplans of three 18 hole courses on the island of Gran Canaria in the Canary Islands, and the firm’s principal David Williams made a week long pre-Christmas visit to view and inspect the ongoing work.
At Real Club de Golf de Las Palmas, the oldest golf club in Spain, in the north of the island, work is continuing on the implementation of their 2018 Masterplan, albeit slightly delayed by the intervening Covid pandemic.

The RCG Las Palmas course at Bandama is situated right on the edge of an extinct volcano
As David explains “Although the oldest established golf club in Spain, founded in 1891, it is no longer played on its original site on the outskirts of Las Palmas, as expansion of the city during the 1950s took over that original course, so the club moved to its present dramatic site at Bandama, right next to an extinct volcano.
The resultant course was designed by renowned Scottish architect, Phillip Mackenzie Ross, and initially was a very open landscape, almost completely devoid of trees or other vegetation.
However, in the past seventy years, many thousands of trees have been planted, leading to the current holes almost all being tree lined. So one major item within the masterplan was the removal of many of these, especially the non-native varieties, to return the course to closer to its original concept.
Another major issue, and one found on many courses throughout the UK and mainland Europe, is that the Ladies tees, often built just in front of the Men’s equivalent, produced too long – and therefore too difficult – a hole for the ladies.
The masterplan recommended the construction of new ladies tees on most holes, allowing the difficulty from all tees to be balanced, and this has now been achieved on many of them, including on the par 5 9 th and 18 th holes, and in recent months on the par 3 15 th hole, where previously many ladies could not reach the green with their tee shot – thereby playing the hole as a par 4, and teeing off whilst players in front were still on the green!”

The greens of the par 5 9 th and 18 th holes are situated in front of the dramatic clubhouse
Other major works undertaken include the removal of grass from the carry areas of most holes, and its replacement with the native underlying sand, which not only reduces water consumption greatly but also eases the hole for shorter hitters, as the rolled sand allows shots to reach the fairway, whereas in the past, they would have stopped in the long grass.
One particular feature of the existing course was the proliferation of individual trees situated right in the middle of the fairway, and at a distance that usually penalised the shorter hitter and average players; these existed on the 2 nd , 6 th , 13 th and 14 th holes, and are gradually being removed.
David continues “2026 will see an acceleration in the implantation work, with the complete re-design and re-construction of the 12 th green complex, as well as the provision of new drive bunkers on the hole to compel players to make a decision off the tee whether the try for the almost reachable green. A couple of other greens are to be re-contoured to improve drainage and provide additional pinable areas.
In addition, many of the holes, especially the par 5 holes, are relatively unprotected off the tee, especially for longer hitters. New fairway bunkering, at drive distance for such players, is to be built on the par 5 9 th and 16 th holes, and possibly in the future also on the par 5 18 th hole.”
It is anticipated that completion of the implementation of the masterplan will be completed within the next few years, allowing a course much more capable of withstanding modern challengers.

The luxurious 5* Salobre hotel overlooks the Old/South Course at this impressive venue
At the luxurious 5* Salobre Resort in the south of the island, DWGD carried out an inspection and produced masterplans for the resort’s two 18 hole courses in 2022, so just as the resort was easing out of the Covid restrictions. At that time, only the Old/South Course had re-opened, with the New/North Course closed for play at that time. Subsequently, the nine holes of that course closest to the clubhouse – holes 1 to 3, and 13 to 18 – re-opened for play in late 2024.
The Old/South Course at the resort was opened in 1999, where renowned British architect Dave Thomas was initially involved in the layout, although the detailed design was undertaken by Roland Favré.
As David explains “The major issue of both masterplans was to improve the sustainability of both courses, and one solution was the proposal to make a large reduction in water usage by greatly reducing the grasses areas, with the introduction of picón, a dark local sand, in the carry areas and off all fairways.
On the Old/South Course, this has now been achieved, where we have been assisted by Surtec Golf Agronomy, in changing all the sprinklers at the edges of the fairways from their previous 360° conformation to one of 180°, so only the fairways are irrigated – and not the areas outside them.
Not only has this resulted in a great reduction in areas requiring watering, it has improved the playing and visual characteristics of the holes.

The introduction of picón to the formerly rough areas has improved the visual and playing characteristics of the course
Another issue addressed within the masterplan was dealing with the continuing effect of new housing development on the course, where recent building had, and future building will, encroach on safety values. The masterplan suggested the re-positioning and re-aligning of some tees, and well as additional bunkering, and many have been carried out. My December visit concentrated on such issues affecting the 12 th hole, where two new drive bunkers have been introduced to the right of the fairway, which has also been widened to the left.”
The masterplan also suggested the removal of some bunkers, the creation of a small number of new ones, and the re-building of all remaining ones to give a consistency throughout the course. The majority of this work is programmed for summer 2026, a relatively quiet time in playing numbers on the course. Other works proposed and to be implemented in future years include the total re-construction of the continuous cart path, and surrounding areas.
Initially nine holes of the New/North Course were built in 2005, consisting of what became holes 1 to 3 and 13 to 18 of the final 18 hole layout. Renowned American architect, Ron Kirby, long-time associate of Jack Nicklaus, was involved in the initial layout of these nine holes, although not with the further nine holes added a few years later to complete the 18 hole layout.
The two 18 hole courses are very different; the Old/South Course being a typical resort type development, with holes surrounded by increasing housing development. In contrast, the New/North layout is in a totally undeveloped ‘moonscape’ type landscape, and initially designed to be the tougher course of the two, over 500 metres longer and with many long and difficult carries, both off the tees and to some greens.
However, some safely issues have developed, some caused by encroaching housing, so the course has been reduced in length by almost 1,000 metres, but not necessarily in difficulty, with the many long carries remaining. This dilemma was strongly addressed in the masterplan.
As is stated above, nine holes have re-opened, and it is the intention to re-open the remaining nine in autumn this year, with considerable re-construction works ongoing to meet that deadline.

Nine holes of the New/North Course are currently closed, but will re-open this autumn
These re-construction works will include the re-contouring of three greens to eliminate previous design issues, and the construction of many new bunkers to add to the strategic challenge of the course. It is currently intended that these works will be undertaken in-house with the resort’s own greenstaff.